+966 50 741 9596
info@noteinternational.me
East Riyadh

Home / Services / General Contracting & Civil Works

Service Detail — Civil & Structural

General Contracting & Civil Works

Full-scope turnkey structural construction, earthworks, foundations, and residential developments built to strict SBC codes — structured for independent lump-sum packages or consolidated master EPC delivery.

✓ SBC 303 Verified Engineering

✓ Grade 60 Steel Precision

✓ Zero Non-Conformance Target

38,000 m³

Concrete Poured

450+

Villas Delivered

14-day

Slab Cast Cycle

100%

SBC Compliance

Capability Overview

Multi-Unit Reinforced Concrete Shell Framing & Ground Engineering

14-day cycle times per slab casting achieved via high-early-strength mix designs and automated formwork systems. From rocky limestone terrain to saline groundwater conditions, our civil division executes with zero structural non-conformance reports.

Core Civil & Structural Packages

Earthworks, Grading & Deep Foundation

Laser-guided subgrade leveling, dynamic soil compaction, cast-in-situ bored piles, secant retaining walls, and rock trenching. (SBC 303 verified)

Reinforced Concrete Superstructures & PT Slabs

Raft foundations, column grids, shear walls, post-tension long-span slabs, and waterproof substructures for aggressive thermal cycles. (Grade 60 steel)

Masonry, Blockwork & Structural Steel Erection

AAC thermal-insulated block, heavy structural steel portal frames, roof trusses, and industrial canopies. (AISC compliant)

Asphalt Paving, Drainage & Civil Utilities

Base-course compaction, DBM surfacing, precast culverts, stormwater attenuation, gravity sewage trunks, and fire-hydrant rings. (Municipal standard)

Turnkey Residential Villa Compounds (ROSHN Standard)

Mass-scale residential clusters: structural grey shell, insulated envelope, boundary walls, paved corridors, and comprehensive MEP stub-outs.

QA/QC & Structural Engineering Standards

Site laboratory protocols enforce zero tolerance for structural drift and batch inconsistency, verified against SBC 303/304 with pre-pour batch inspection.

Procurement Direct

Request Civil Works Quotation

Submit project details for formal BOQ analysis, technical submittals, or competitive lump-sum bidding.

Request logged. Our estimation division will respond with a BOQ scope within one business day.

Direct Contractor Escalation

+966 50 741 9596 · Tenders Directorate

info@noteinternational.me

Sunday – Thursday, 8:00 AM – 6:00 PM

Civil Engineering FAQ

Frequently Asked Questions

How is a BOQ tender submission handled?

Submit drawings and specifications via the form; our estimation engineering division returns complete quantity take-offs and technical submittals within 5–7 business days for turnkey civil / structural packages.

What contracting models do you work under?

Unit Rate, Lump Sum Turnkey (LSTK), and Target Cost / Reimbursable with GMP — all under Saudi Procurement and FIDIC guidelines.

Which quality standards govern your concrete works?

Site laboratory protocols enforce zero tolerance for structural drift and batch inconsistency, verified against SBC 303/304 with relevant ACI / BS EN references and pre-pour batch inspection.

Can you self-perform across multiple regions simultaneously?

Yes — regional hubs in Riyadh, the Eastern Province and the Western Province allow parallel mobilisation with dedicated fleet logistics and centralised housing.

Partner with a Grade-A Civil Contractor Built for Vision 2030 Scale

Formal BOQ analysis, technical submittals and competitive lump-sum bids on request.