+966 50 741 9596
info@noteinternational.me
East Riyadh

Home / Services / Facility & Logistics Infrastructure

Service Detail — Facility & Logistics

Facility & Logistics Infrastructure

Turnkey pre-engineered steel warehouses, temperature-controlled cold stores, heavy hardstands, HCIS-class perimeter security, and comprehensive hard facility management.

✓ AISC & SBC 301 Fabricated

✓ SFDA Compliant Cold Stores

✓ HCIS Class-1 Accredited

8–18m

PEB Clear Height

60m

Single-Span Frame

H-20

AASHTO Slab Loading

99.9%

FM Uptime Guarantee

Capability Overview

Turnkey Infrastructure Offerings

Designed to absorb high point loads, extreme desert thermal oscillation, and maximum high-throughput forklift handling — vetted against SBC 301–306 for seismic considerations, extreme wind loads up to 150 km/h, and municipal civil-defence protocols.

Turnkey Infrastructure Packages

Pre-Engineered Steel Buildings (PEB) & Warehousing

Clear-span portal steel frames (8–18m clear height, up to 60m span) in AISC / SBC 301 high-yield steel with skylights, automated louvers and overhead bridge-crane brackets.

Temperature-Controlled Cold Stores & Pharma Grade

Chiller cells (-2°C to +8°C) and deep-freeze (-25°C to -18°C) with 150–200mm PIR/PUR sandwich panels, rapid-roll insulated doors, and IoT cloud logging for SFDA qualification.

Concrete Hardstands & Heavy Truck Aprons

Reinforced jointless laser-screed superflat pours, heavy maneuvering aprons, and hydraulic dock levelers with inflatable shelter seals for continuous multi-axle freight. (AASHTO H-20 / HS-20)

Industrial Perimeter & HCIS Class-1 Security

PAS 68 / K12 anti-ram crash barriers, razor-mesh fencing, ballistic inspection guardhouses, thermal perimeter CCTV, and automated ANPR access gates meeting HCIS SEC-01 to 08.

Comprehensive Hard Facility Management

Preventive and corrective maintenance for heavy industrial shells: rooftop chillers, NFPA-certified fire-pump networks, FM2 floor-joint repair, HV transformers, and high-bay lighting. 99.9% uptime.

Engineering & Structural Standards

FM2 industrial superflat floors to TR34 4th Edition, non-combustible PIR thermal envelopes (<0.22 W/m²K), full SBC 301–306 vetting, and NFPA-certified ESFR life-safety systems.

Logistics Project Desk

Logistics & PEB RFP Desk

Submit structure type, area and clearance height for a formal pre-engineered building proposal.

RFP logged. Our facility engineering desk will respond with a structural proposal shortly.

Facility Director Line

+966 50 741 9596 · Logistics Desk

info@noteinternational.me

Sunday – Thursday, 8:00 AM – 6:00 PM · 24/7 FM Rapid SLA

Logistics Infrastructure FAQ

Logistics Infrastructure FAQs

What are the typical lead times for custom PEB steel structure fabrication?

Detailed design and approvals run 3–4 weeks; primary steel fabrication and delivery to site is typically 8–12 weeks depending on span, crane provisions and cladding specification.

Does Note International handle MODON and Civil Defense permitting?

Yes — full design vetting and submission against SBC 301–306, MODON industrial-city requirements and municipal Civil Defense safety protocols is part of the turnkey scope.

Can your flooring support high-reach wire-guided VNA turret trucks?

Yes. FM2 industrial superflat floors are cast to TR34 4th Edition Class FM2 for narrow-aisle racking up to 14 metres, with point loads engineered for 80–120 kN concentrations.

What temperature monitoring standards apply to pharmaceutical cold stores?

Continuous IoT cloud data-logging with redundant chiller arrays and validated mapping for SFDA qualification, plus alarmed excursion reporting and calibrated sensor networks.

Build a Turnkey Logistics Terminal Engineered for Kingdom-Scale Throughput

Submit structure type, area and clearance height for a formal PEB proposal.