Home / Projects / Riyadh Schools, Tilal District — Finishing
Riyadh Schools, Tilal District — Architectural Finishing Works
Architectural finishing and fit-out packages for school buildings in the Tilal Riyadh development, executed as a subcontract to Al Tameer — plaster, tiling, gypsum, painting, joinery, doors and washroom fit-out.
Tilal Riyadh District — Riyadh, Kingdom of Saudi Arabia
Finishing
Package scopeSchools
Building typeMulti-Block
Project scaleAl Tameer
Main contractorSBC
Workmanship codeHandover
Ready for occupationCorridor — glazed partitions, feature wall panels and slat ceilings.
Multipurpose hall — carpet, ceilings and paint finishing.
Assembly hall — timber-batten ceilings, glazing and wall paneling.
Handover-Ready Classrooms, Corridors and Support Areas
Al Tameer engaged Note International Contracting to deliver the finishing package for school buildings in the Tilal Riyadh District. Work covered classrooms, laboratories, administration areas, corridors, washrooms and external areas — from plaster and screed through to painting, joinery, doors, sanitary fit-out and final cleaning for handover.
The Execution Challenge
School fit-out has to be robust, safe and easy to maintain — hard-wearing finishes, compliant balustrades and door hardware, and a fast turnaround so buildings are ready for the academic calendar. Blocks were finished and handed over in sequence.
Finishing Scope of Work
Plaster, Screed & Tiling
Internal and external plaster, floor screeds, ceramic and porcelain wall and floor tiling to classrooms, wet areas and circulation, with anti-slip finishes to ramps and stairs.
Anti-slip to circulationGypsum & Painting
Suspended and MF gypsum ceilings, bulkheads and cornices, and washable emulsion and enamel paint systems selected for school durability.
Washable paint systemsJoinery, Doors & Furniture
Timber and laminate joinery, cupboards and worktops, solid-core and fire-rated doors with ironmongery, vision panels, boards, and fixed furniture.
Fire-rated door setsWashrooms & Handover
Cubicle systems, sanitary ware and accessories, mirrors and floor drainage falls, plus cleaning, snagging and block-by-block handover to Al Tameer.
Block-by-block handoverHow the Finishing Was Delivered
Wet Trades
Plaster, screed, tanking and tiling completed block-by-block with level and moisture checks before dry trades.
Ceilings, Paint & Joinery
Gypsum ceilings, painting systems, joinery, doors, boards and fixed furniture installed and protected ahead of second-fix.
Washrooms, Snagging & Handover
Sanitary fit-out, cubicles and accessories, final clean, snagging and de-snagging, and handover of each block to the main contractor.
Project Factsheet
Need a School Finishing Subcontractor?
Send your finishes schedule and BOQ. We will return a competitive fit-out proposal built around the academic programme.
Request a Proposal Direct line · +966 50 741 9596Compliance
Work executed under a Saudi Contractors Authority registered entity, to Saudi Building Code, with documented QA/QC and structured snagging records.
Explore More Projects
View all projects →Al Noor International Schools — Maintenance Works
Planned and reactive maintenance across operating school campuses.
Al-Kharj 10,000 m² Coal Storage Warehouse
Covered industrial storage — structure, cladding and hardstanding.
Finish Your Project with Note International
Schools, offices or residential — share your finishes schedule and BOQ and we will respond with a proposal and programme.
