+966 50 741 9596
info@noteinternational.me
East Riyadh

Home / Services / Electro-Mechanical & MEP Works

Service Detail — MEP Engineering

Electro-Mechanical & MEP Works

Industrial-grade HVAC, electrical distribution substations, hazardous fire suppression, and pressurized process piping — engineered to Saudi authority compliance and delivered without handover delays.

✓ Substation Engineering up to 132kV

✓ NFPA 13 / 15 / 20 Fire Systems

✓ Saudi Civil Defense Approved

132kV

Substation Grade

52°C+

HVAC Ambient Class

200 PSI

Hydrostatic Hold Test

SMACNA

Certified Ductwork

Capability Overview

Integrated MEP Engineering Disciplines

We embed Saudi authority compliance milestones into every stage of execution — from foundation placement and switchgear line-ups to VLF cable diagnostics and fire-pump churn calibration — eliminating handover delays across industrial, commercial and healthcare facilities.

Engineering Discipline Coverage

HV & MV Substations & Cable Laying

Primary substations, transformer setups, GIS/AIS switchgear, relay racks, and XLPE underground transmission up to 132kV — with VLF tan-delta diagnostics and busbar micro-ohm verification.

Industrial & District HVAC Infrastructure

Centrifugal water-cooled chillers, VRF banks, explosion-proof ventilation, hospital AHUs, and SMACNA-certified ductwork engineered for 52°C+ Gulf ambient.

Fire Protection & Industrial Deluge Networks

UL/FM fire-pump skids, foam-water deluge for petrochemical tanks, FM-200 / Novec 1230 clean-agent flooding, and wet-pipe grids. (NFPA 13 / 15 / 20)

Plumbing, Effluent & Process Piping

Corrosion-resistant sanitary networks, RO purification skids, CS/SS316/HDPE process spooling, grease interceptors, and storm-retention lift stations.

BMS, SCADA & Low-Current Engineering

BACnet/Modbus field controllers, CCTV and biometric meshes, energy-management loops, and dual-redundant single-mode fibre-optic backbones.

Testing, Pre-Commissioning & Authority Approvals

Third-party witnessed hydrostatic holds, duct-leak tests, fire-pump flow calibration, and Civil Defense / SEC / Aramco GI submittals embedded in the programme.

Technical & Commercial

MEP Scope Estimator

Share your discipline and load requirements to receive a technical and commercial MEP proposal.

Inquiry logged. Our MEP engineering desk will respond with a technical scope shortly.

Direct MEP Engineering Line

+966 50 741 9596 · Engineering Desk

info@noteinternational.me

Sunday – Thursday, 8:00 AM – 6:00 PM

Technical MEP FAQ

Frequently Asked Questions

Do you provide Saudi Civil Defense and authority submittals?

Yes — every fire, electrical and mechanical package includes authority-ready submittals (Civil Defense, SEC, Aramco GI) with review milestones embedded in the execution programme.

What testing and pre-commissioning is included?

VLF tan-delta cable diagnostics, hydrostatic 200 PSI holds, busbar micro-ohm verification, duct-leak testing, and fire-pump churn / flow calibration — all third-party witnessed.

Can you work inside live petrochemical facilities?

Yes. Crews hold Aramco / SABIC safety passports and operate under permit-to-work with confined-space and hot-work supervision.

What is the typical MEP mobilisation lead time?

Design-assist and procurement kick off within a week of award; field mobilisation is scoped to the master construction programme with long-lead switchgear tracked from day one.

Accelerate Your MEP Engineering & Substation Delivery

Authority-compliant design, installation, testing and commissioning under one contract.