Home / Services / Facility & Logistics Infrastructure
Service Detail — Facility & Logistics
Facility & Logistics Infrastructure
Turnkey pre-engineered steel warehouses, temperature-controlled cold stores, heavy hardstands, HCIS-class perimeter security, and comprehensive hard facility management.
✓ AISC & SBC 301 Fabricated
✓ SFDA Compliant Cold Stores
✓ HCIS Class-1 Accredited
8–18m
PEB Clear Height
60m
Single-Span Frame
H-20
AASHTO Slab Loading
99.9%
FM Uptime Guarantee
Capability Overview
Turnkey Infrastructure Offerings
Designed to absorb high point loads, extreme desert thermal oscillation, and maximum high-throughput forklift handling — vetted against SBC 301–306 for seismic considerations, extreme wind loads up to 150 km/h, and municipal civil-defence protocols.
Turnkey Infrastructure Packages
Pre-Engineered Steel Buildings (PEB) & Warehousing
Clear-span portal steel frames (8–18m clear height, up to 60m span) in AISC / SBC 301 high-yield steel with skylights, automated louvers and overhead bridge-crane brackets.
Temperature-Controlled Cold Stores & Pharma Grade
Chiller cells (-2°C to +8°C) and deep-freeze (-25°C to -18°C) with 150–200mm PIR/PUR sandwich panels, rapid-roll insulated doors, and IoT cloud logging for SFDA qualification.
Concrete Hardstands & Heavy Truck Aprons
Reinforced jointless laser-screed superflat pours, heavy maneuvering aprons, and hydraulic dock levelers with inflatable shelter seals for continuous multi-axle freight. (AASHTO H-20 / HS-20)
Industrial Perimeter & HCIS Class-1 Security
PAS 68 / K12 anti-ram crash barriers, razor-mesh fencing, ballistic inspection guardhouses, thermal perimeter CCTV, and automated ANPR access gates meeting HCIS SEC-01 to 08.
Comprehensive Hard Facility Management
Preventive and corrective maintenance for heavy industrial shells: rooftop chillers, NFPA-certified fire-pump networks, FM2 floor-joint repair, HV transformers, and high-bay lighting. 99.9% uptime.
Engineering & Structural Standards
FM2 industrial superflat floors to TR34 4th Edition, non-combustible PIR thermal envelopes (<0.22 W/m²K), full SBC 301–306 vetting, and NFPA-certified ESFR life-safety systems.
Logistics Project Desk
Logistics & PEB RFP Desk
Submit structure type, area and clearance height for a formal pre-engineered building proposal.
Facility Director Line
+966 50 741 9596 · Logistics Desk
info@noteinternational.me
Sunday – Thursday, 8:00 AM – 6:00 PM · 24/7 FM Rapid SLA
Logistics Infrastructure FAQ
Logistics Infrastructure FAQs
What are the typical lead times for custom PEB steel structure fabrication?
Detailed design and approvals run 3–4 weeks; primary steel fabrication and delivery to site is typically 8–12 weeks depending on span, crane provisions and cladding specification.
Does Note International handle MODON and Civil Defense permitting?
Yes — full design vetting and submission against SBC 301–306, MODON industrial-city requirements and municipal Civil Defense safety protocols is part of the turnkey scope.
Can your flooring support high-reach wire-guided VNA turret trucks?
Yes. FM2 industrial superflat floors are cast to TR34 4th Edition Class FM2 for narrow-aisle racking up to 14 metres, with point loads engineered for 80–120 kN concentrations.
What temperature monitoring standards apply to pharmaceutical cold stores?
Continuous IoT cloud data-logging with redundant chiller arrays and validated mapping for SFDA qualification, plus alarmed excursion reporting and calibrated sensor networks.
Build a Turnkey Logistics Terminal Engineered for Kingdom-Scale Throughput
Submit structure type, area and clearance height for a formal PEB proposal.
