Sedra Ewan Housing Project — Villa Architectural Finishing Works
Full internal and external architectural finishing package for residential villas at the Sedra Ewan community on ROSHN Front — plaster, screed, tiling, gypsum, painting, joinery and doors, delivered snag-free to BCC — Construction & Development Company.
Sedra Ewan, ROSHN Front — Riyadh, Kingdom of Saudi Arabia
Finishing
Package scopeVillas
Residential clusterInt + Ext
Scope splitSBC
Workmanship code3-Tier
Snagging workflow0
Punch-list holdoverVilla finishing package in progress — plaster, screed, tiling, painting and joinery across the Sedra Ewan units, ROSHN Front.
Completed villa facade and entrance canopy — Sedra Ewan, ROSHN Front.
Finished villa exterior with carport and landscaping — Sedra Ewan, ROSHN Front.
External plaster and facade finishing under scaffold — Sedra Ewan, ROSHN Front.
Turning Completed Structures into Handover-Ready Homes
Following the concrete and blockwork phase, Note International Contracting delivered the full architectural finishing package for a cluster of Sedra Ewan villas. Work covered internal and external plaster, floor and roof screeds, wall and floor tiling, gypsum works, painting, timber and aluminium joinery, doors and ironmongery, and sanitary and kitchen fit-out ready for developer handover.
The Execution Challenge
Dozens of identical villas had to be finished to one standard and handed over on a rolling schedule, with wet trades, dry trades and MEP second-fix all sequenced inside each unit. Every villa passed a structured three-tier snagging process before it was accepted.
Finishing Scope of Work
Plaster, Screed & Waterproofing
Internal and external cement plaster, floor and roof screeds laid to falls, wet-area tanking, and substrate preparation for tiling and paint.
Wet areas tankedTiling, Stone & Flooring
Wall and floor ceramic and porcelain tiling, skirtings and thresholds, natural stone to selected areas, and external hard-landscape finishes.
Full villa tilingGypsum, Paint & Joinery
Gypsum board ceilings and bulkheads, cornices, emulsion and enamel paint systems, MDF and timber joinery, wardrobes, kitchens, and doors with ironmongery.
Emulsion + enamel systemsMEP Second-Fix & Handover
Coordination of electrical accessories and light fittings, sanitary ware, mixers and kitchen appliances, followed by cleaning, snagging and unit-by-unit handover.
Snag-free acceptanceHow the Finishing Was Delivered
Wet Trades & Substrates
Plaster, screeds, tanking and tiling completed floor-by-floor with moisture and level checks before dry trades started in each villa.
Dry Trades & Fit-Out
Gypsum ceilings, painting, joinery, wardrobes, kitchens, doors and ironmongery installed and protected ahead of second-fix.
Second-Fix, Snagging & Handover
MEP accessories and sanitary ware fitted, final clean, three-tier snagging and de-snagging, and unit-by-unit handover to the developer.
Project Factsheet
Need a Finishing Subcontractor?
Send your finishing BOQ and finishes schedule. We will return a competitive villa-finishing proposal with a realistic unit handover programme.
Request a Proposal Direct line · +966 50 741 9596Compliance
Work executed under a Saudi Contractors Authority registered entity, to Saudi Building Code, with documented QA/QC and structured snagging records.
Explore More Projects
View all projects →Sedra Ewan Villas — Reinforced Concrete Structures
The structural concrete package for the same villa cluster.
Al Noor International Schools — Maintenance Works
Planned and reactive maintenance across operating school campuses.