Home / Projects / Sedra Ewan Villas — Finishing Works

Completed Ref: NIC-FIN-SEW
Finishing & Fit-Out Handed Over Client: BCC — Construction & Development

Sedra Ewan Housing Project — Villa Architectural Finishing Works

Full internal and external architectural finishing package for residential villas at the Sedra Ewan community on ROSHN Front — plaster, screed, tiling, gypsum, painting, joinery and doors, delivered snag-free to BCC — Construction & Development Company.

Sedra Ewan, ROSHN Front — Riyadh, Kingdom of Saudi Arabia

Finishing

Package scope

Villas

Residential cluster

Int + Ext

Scope split

SBC

Workmanship code

3-Tier

Snagging workflow

0

Punch-list holdover
On-site photography — interior and external finishing works on the Sedra Ewan villas, ROSHN Front, Riyadh.

Villa finishing package in progress — plaster, screed, tiling, painting and joinery across the Sedra Ewan units, ROSHN Front.

Completed villa facade and entrance canopy — Sedra Ewan, ROSHN Front.

Finished villa exterior with carport and landscaping — Sedra Ewan, ROSHN Front.

External plaster and facade finishing under scaffold — Sedra Ewan, ROSHN Front.

Handover Gallery

Completed Villas at Sedra Ewan

Finished villa frontages, stone-clad facades, carport canopies and entrance details, as handed over to the developer at ROSHN Front, Riyadh.

Site Videos

Site walkthrough — Sedra Ewan villas
Site walkthrough — Sedra Ewan villas
Project Context & Objective

Turning Completed Structures into Handover-Ready Homes

Following the concrete and blockwork phase, Note International Contracting delivered the full architectural finishing package for a cluster of Sedra Ewan villas. Work covered internal and external plaster, floor and roof screeds, wall and floor tiling, gypsum works, painting, timber and aluminium joinery, doors and ironmongery, and sanitary and kitchen fit-out ready for developer handover.

The Execution Challenge

Dozens of identical villas had to be finished to one standard and handed over on a rolling schedule, with wet trades, dry trades and MEP second-fix all sequenced inside each unit. Every villa passed a structured three-tier snagging process before it was accepted.

Rolling unit-by-unit finishing and handover sequence Wet, dry and MEP second-fix trades coordinated inside each villa Three-tier snagging with zero punch-list items carried over
Delivery Breakdown

Finishing Scope of Work

Plaster, Screed & Waterproofing

Internal and external cement plaster, floor and roof screeds laid to falls, wet-area tanking, and substrate preparation for tiling and paint.

Wet areas tanked

Tiling, Stone & Flooring

Wall and floor ceramic and porcelain tiling, skirtings and thresholds, natural stone to selected areas, and external hard-landscape finishes.

Full villa tiling

Gypsum, Paint & Joinery

Gypsum board ceilings and bulkheads, cornices, emulsion and enamel paint systems, MDF and timber joinery, wardrobes, kitchens, and doors with ironmongery.

Emulsion + enamel systems

MEP Second-Fix & Handover

Coordination of electrical accessories and light fittings, sanitary ware, mixers and kitchen appliances, followed by cleaning, snagging and unit-by-unit handover.

Snag-free acceptance
Execution Roadmap

How the Finishing Was Delivered

Stage 1

Wet Trades & Substrates

Plaster, screeds, tanking and tiling completed floor-by-floor with moisture and level checks before dry trades started in each villa.

Stage 2

Dry Trades & Fit-Out

Gypsum ceilings, painting, joinery, wardrobes, kitchens, doors and ironmongery installed and protected ahead of second-fix.

Stage 3

Second-Fix, Snagging & Handover

MEP accessories and sanitary ware fitted, final clean, three-tier snagging and de-snagging, and unit-by-unit handover to the developer.

Project Factsheet

Project — Sedra Ewan Villas, Finishing Works Location — ROSHN Front, Riyadh Client / Main Contractor — BCC — Construction & Development Package — Architectural finishing (internal & external) Scope — Plaster, screed, tiling, gypsum, paint, joinery Standards — Saudi Building Code (SBC) workmanship Status — Villas finished and handed over
Subcontract Desk

Need a Finishing Subcontractor?

Send your finishing BOQ and finishes schedule. We will return a competitive villa-finishing proposal with a realistic unit handover programme.

Request a Proposal Direct line · +966 50 741 9596

Compliance

Work executed under a Saudi Contractors Authority registered entity, to Saudi Building Code, with documented QA/QC and structured snagging records.

Explore More Projects

View all projects →
← Previous project

Sedra Ewan Villas — Reinforced Concrete Structures

The structural concrete package for the same villa cluster.

Next project →

Al Noor International Schools — Maintenance Works

Planned and reactive maintenance across operating school campuses.

Have a Package to Award?

Finish Your Project with Note International

Plaster to handover, or full turnkey fit-out — share your finishes schedule and BOQ and we will respond with a proposal and programme.